How it works

From call to keys.

Pod Essentials in 4–8 weeks. Pod Living & Villa over months — design, permits, and construction, all managed by us.

Two tracks

Pick the path that fits.

The process differs by product, and the biggest difference is permitting. Here’s how it works for each.

Pod Essentials are typically under 200 square feet, and in most Texas jurisdictions — including the City of Austin — that means no building permit is required. Most cities do still require trade permits, usually an electrical permit and a mechanical permit for the mini-split HVAC, which we file on your behalf. A few jurisdictions don’t require even those — we confirm exactly what your address needs before you commit.

Pod Living and Pod Villa are permitted backyard ADUs (accessory dwelling units), so the requirements are more involved. Depending on your jurisdiction, we supply either a full architectural plan set — sometimes with stamped structural engineering — or, in lighter jurisdictions like many Texas counties, a simpler set of plans. That’s why we offer two architectural plan options at different price points, so you only pay for what your city actually requires.

Whenever a building permit is required, the timeline stretches: there are more inspections, more plan review, and more back-and-forth with the jurisdiction. That’s the main reason Pod Living and Villa take longer to build than Pod Essentials — and why we’re upfront about the timeline for each from day one.

Pod Essentials and WorkPods

Pod Essentials & WorkPods

Usually no building permit. Built and installed in 4–8 weeks, start to finish.

Pod Living and Villa

Pod Living & Villa

Permitted ADUs. Months of design, permitting, and construction — we manage every step.

Step by step

Eight steps, fully managed.

1

Consultation

A 15-minute call to scope your space, budget, and goals.

~15 minutes
Learn more

This is a phone call with our design & purchase consultant, where you can ask any questions you have. We’ll learn more about your site and your goals, and help you pick the right pod.

2

Free site visit

We come to your property to confirm access, placement, and feasibility.

~1 hour · free
Learn more

We come out to your property to review the site in person, so we can give you a more detailed estimate based on your specific site requirements.

3

$500 refundable deposit

Reserve your build slot. Fully refundable if you don’t move forward.

Refundable
Learn more

At this point we start working on your project and place you on our design and installation pipeline.

4

Design

Pick your model and finishes and meet your project manager.

Days (Essentials) · weeks (Living/Villa)
Learn more

For Pod Essentials, we typically hold two 30-minute design meetings. For Pod Living and Villa, it’s usually two to three meetings of 30 minutes to an hour to finalize your design.

You’ll meet with our drafter and your project manager to finalize the design before we submit it for permits or begin building.

5

Permitting

We file permits where required and manage the jurisdiction for you.

Usually none for Essentials · 3–6 months Living/Villa
Learn more
Pod Essentials

For Pod Essentials, we typically just file the trade permits your jurisdiction requires — usually the electrical and HVAC permits.

Pod Living & Villa

Depending on your jurisdiction, we file for full building permits. We offer two tiers of plan applications depending on how complex the project is and how much detail the local jurisdiction requires.

Preparing the architectural and engineering plans plus the application typically takes one to two months, and permit approval itself can take anywhere from two to six months for more complex applications. In simpler jurisdictions, plans can be ready in as little as two weeks and approval in as little as two weeks.

6

Construction

Foundation, build, delivery, and install — handled end-to-end.

4–8 weeks Essentials · 6–12 months Living/Villa
Learn more
Pod Essentials

Different crews come out for the different stages of construction, so there will be natural pauses as one crew finishes and we wait for the next to free up — meaning some days no one will be on site. That’s normal. Start to finish, we’re looking at four to eight weeks, which can be affected by weather, inspectors, and other factors.

Pod Living & Villa

The timeline varies a lot by jurisdiction — there may be many inspections or very few. In places like the City of Austin, a number of inspections cause work stoppages, often around the utilities and the vertical build. Our six-to-twelve-month range accounts for that.

7

Walkthrough

We walk the finished pod together and address any punch-list items.

~1 hour
Learn more

Before the final walkthrough, we do a preliminary walkthrough with you and build a punch list, which we note and send over. Our team then works through every item.

At the final walkthrough, we go through the pod together to confirm all punch-list items are complete — and that we’re ready for all inspections to be closed and the project closed on our end.

8

Handoff

Keys in hand, backed by the strongest warranty in the category.

10-year structural warranty
JobTread JOBTREAD
Managed for you

Your whole project, in JobTread.

We run every build in JobTread — a state-of-the-art construction-management platform. You get your own client portal to stay on top of the project from your phone or email, from first estimate to final handoff.

  • Your estimate & every bill in one portal — all billing flows through JobTread, so it’s easy to keep track.
  • See change orders as they happen and know exactly what each charge is for.
  • Message us directly in the portal to communicate with your team anytime.
  • Progress logs so you can follow every stage of your build.
  • Files & selections uploaded for you — your documents and finish selections, all in one place.
  • On your phone or email — state-of-the-art, so nothing about your project slips through the cracks.
From $260/moUp to 80% financing on combined home + pod value. Acorn financing, home-equity loans, and construction financing available.
Get pre-qualified
Permits, handled

We navigate your city.

Austin — HOME Initiative, up to 3 units/lot
Houston — 1,500 sq ft footprint, 5-ft setbacks
San Antonio — full permit management
10-yr

Structural

Foundation and frame — the category leader.

2-yr

Systems

HVAC, electrical, and plumbing.

1-yr

Workmanship

Bumper-to-bumper craftsmanship.

Questions

Frequently asked.

Do I need a permit?
Most Pod Essentials (≤200 sq ft) need no building permit, though some cities require trade permits. Pod Living and Villa require a building permit — we manage the plans, submission, and fees end-to-end.
How long does it really take?
For Pod Essentials, the build runs 4–8 weeks. For Pod Living and Villa, it typically takes 3–6 months to obtain building permits — though a complex site or project can take longer — and then we budget 6–12 months for construction, depending on how involved your utility connections are and which jurisdiction you’re in.
What’s included in the price?
Your pod with foundation, delivery, install, insulation, and HVAC. Utilities, permits (where required), and site work are quoted separately and finalized by site measurement.
How does financing work?
Up to 80% financing on the combined value of your home and pod, via Acorn financing, home-equity loans, or construction financing. Many customers start around $260/mo.
Is the deposit refundable?
Yes — the $500 deposit that reserves your build slot is fully refundable if you decide not to move forward.
Can I see one in person?
Absolutely. Visit our showroom pods at Lowe’s Brodie Lane in Austin and in Wimberley. Book a tour from the Showroom page.